Skip to main content
// FOUNDRY5
NHS DTAC and clinical safety

If what you build can affect somebody's health, the review hinges on a hazard log that still has to match your product on the day a reviewer opens it, eleven releases after it was written. Safe products lose this review when the paperwork drifts away from the code.

✓ Your clinical safety officer signs the safety case · The build gives them evidence to sign

4Evidence areas we map
5Days to a hazard-led plan
0Clinical advice given
The four evidence areas

Four things a clinical review wants to see in the product.

Your clinical safety officer decides the risk picture. Your information governance lead decides the data position. The build's job is to make the product evidence both, for a reviewer who will never meet the people who designed it.

What the review asks · 01

That one DTAC submission covers clinical safety, data protection, technical security, interoperability, and usability and accessibility, and that the five answers agree.

What that means for the build

Five topics that live in five different heads have to agree with each other in writing. Most of the work is finding where they contradict, before the assessor does.

What the review asks · 02

What the trust's own governance adds on top of the assessment.

What that means for the build

Data flow detail, a retention position, penetration test results, an incident and support process, and a named person against each. The trust also runs its own clinical risk process under DCB0160, and that process feeds on your evidence. Anything that exists only as slides has to be produced properly.

What the review asks · 03

That every hazard the product can create was identified, and that something in the product addresses it.

What that means for the build

Under DCB0129, the clinical risk standard for manufacturers of health IT, the hazard log carries that evidence. Built well, it traces each hazard to a feature and to the release it shipped in. A mitigation nobody can point at in running code is a mitigation on paper only.

What the review asks · 04

Where health data sits, who can reach it, how long it stays, and what happens when somebody asks for it back.

What that means for the build

Residency, access control, retention and deletion are schema and infrastructure decisions. Settle them after launch and you are migrating live patient data, which nobody enjoys and everybody notices.

Fit rules for clinical work

The clinical builds we turn away at the first conversation.

Four of these apply on every gate. The fifth belongs to clinical work, and no amount of engineering closes it.

Where it goes wrong

Where safe products lose a clinical review.

In every one of these the product is safe. What is missing is the proof, and from the reviewer's side of the table, missing proof looks the same as risk.

01 Drift

The hazard log describes a product that no longer exists

It was written at version one, and the product has shipped eleven times since. Like a service history with half the stamps missing, it leaves the reviewer wondering what else went unrecorded.

02 Once

Clinical risk was assessed once, at the end

The assessment became a document produced for the submission instead of a process running alongside the build, so no product decision ever changed because of it.

03 Slides

The data flows were drawn for investors

A diagram that explains the product to a buyer does not say where a record physically sits, who can read it or for how long. Governance asks only the second kind of question.

04 Trace

Nobody can show which release a mitigation shipped in

The mitigation exists and the team remembers building it. The link between the hazard, the change and the version is missing, and that link is the evidence being asked for.

The person who signs

A clinician puts their name to the safety case, so the product has to show its working.

A named clinical safety officer takes responsibility for the clinical safety case. DCB0129 requires that person to be a suitably qualified and experienced clinician with current professional registration, and the judgement they make is theirs, never ours.

What they sign is a claim about how the software behaves, so the software has to make that claim checkable. Hazards are recorded in a form that survives the product changing, and every mitigation traces to the feature and the release that delivered it. Without both, the officer is signing a description of a product instead of the product itself.

If nobody holds this role yet, that is the first problem to solve, and you will hear it from us before a build is quoted.

Where the line sits
  • They decide what the hazards are
  • They write and sign the safety case
  • The build makes the product evidence it
  • Clinical risk advice never comes from the studio
In Philip's words
The clinician who signs the safety case is putting their registration behind it. The least a build team owes them is a product that shows its working in every release, without anyone having to ask.

Philip Wasko

Co-founder, Foundry 5

The Week-One Review

Five days spent on hazards before features.

The clinical version of the Week-One Review starts from what could go wrong for the person using the product, works out what the product has to do about it, and only then opens the roadmap. A founder leads the week, so the people deciding the sequence are the people who will build it.

Day 1 · Name the assessment, the trust and the person who signs the safety case

Day 2 · List the hazards and the evidence the submission will ask for

Day 3 · Test the current product and data model against that list

Day 4 · Decide the sequence and what stays out of version one

Day 5 · Price it, with the hazard log structure ready to maintain

5 days

The fee is quoted before you start and credited against the build when you proceed.

What you walk away with

Yours whether or not you build with us.

Take it to another supplier and it still works.

  • A hazard log structured to be maintained, release after release
  • The data flow and retention position, written down once and properly
  • The features deliberately left out of version one, and why
  • A build plan sequenced backwards from your submission date
The proof

Clementine, and the ORCHA review it was built around.

Clementine is a mental wellness platform built around guided hypnotherapy, expert-led courses and personalised affirmations. Wellbeing products sit in an awkward place. They are not medical devices, but the moment a health service, an employer or an insurer considers recommending one, the clinical questions arrive anyway.

So the answers were built in. The data position, the retention rules and who could reach what were settled as architecture, and the evidence already existed when the ORCHA review came, with nothing assembled under time pressure.

Clementine is ORCHA certified, has been covered in the Wall Street Journal, The Guardian and Forbes, and now serves more than 150,000 members with a 98% helpfulness score.

Read the Clementine case study
Clementine mental wellness app
ORCHA and clinical safety

Clementine

150K+

Trusted members

The regulatory loading

Why clinical work carries its loading into every release.

Most clinical work starts at Band 2. The hazard log, the data flow documentation and the evidence pack are part of the build, and they travel with every release instead of being produced once and filed.

Where the product is narrow and the trust relationship already exists, Band 1 can be enough. The Week-One Review tells you which applies before you commit.

Ask for a quote
Band 2 · Gated production build

Quoted after the Week-One Review

  • Multiple gates where they apply
  • Audit trails and access control
  • Security questionnaire support
  • Post-review remediation included
Clinical questions

What clinical teams ask us about safety cases and trusts.

Every answer is about building the product. Clinical advice stays with your clinical safety officer.

No. A qualified clinical safety officer writes it, signs it and carries the responsibility for it. The build makes sure the product supports what they need to say, and that the hazard log traces to things that shipped.

With yours. If the role is empty, filling it comes before any build is scoped, because nothing in the hazard log can be signed until somebody holds it.

Its own governance list, which varies from trust to trust: data flows, retention, incident handling, test results and a named contact against each. The first week establishes which trust you face and what it has asked suppliers for before.

Yes, with more urgency. A product in live clinical use carries hazards now, so the review runs against what is running today instead of what was planned.

It is logged, assessed and traced to a change like any other, which works only if the log was built to be maintained. That is why its structure gets settled in the first build.

Yes, whenever your buyer has to answer to somebody else. Private providers, insurers and employers ask for much the same evidence, because their own governance borrowed the questions.

One trust / One safety case / One date

Tell us the trust, the assessment and the date.

Those three shape the hazard log, the data position and how much version one can safely carry. Guess at them now and you rebuild them later, with less time and a reviewer already watching. Where a second gate sits behind this one, the regulated software page maps all four side by side.

NOT CLINICAL ADVICE / YOUR CLINICAL SAFETY OFFICER OWNS THE SAFETY CASE